Changes between Version 15 and Version 16 of projects/server-colocation-mexico


Ignore:
Timestamp:
May 31, 2013, 8:37:53 PM (8 years ago)
Author:
Enrique Rosas
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • projects/server-colocation-mexico

    v15 v16  
    4646
    4747 * Energy
    48   * We have 4 UPS [http://www.reguladoresyups.com/catalog/break-break-micro-inet-p-28.html ISB-Solabasic Micro SR inet 800] with batteries dead which we could put back to work within a week. There is also [APC professional UPS options http://www.apc.com/products/family/index.cfm?id=165] in México.
     48  * We have 4 UPS [http://www.reguladoresyups.com/catalog/break-break-micro-inet-p-28.html ISB-Solabasic Micro SR inet 800] with batteries dead which we could put back to work within a week. UPDATE: 2013-05-31 The four UPS ready! manufacturer repaired and loaded.
    4949  * We expect to have initially two servers consuming 500KVA which will represent MXN$800 monthly
    5050 * Configuration of cesar an ALIX.2D2 LX800 small server for backup purposes. Please see [https://support.mayfirst.org/ticket/7070 the ticket that documents this project].